Written by Jason Gledhill, Head of Reliable Maintenance, Senior Consultant at Lauras International.

At the beginning of a new year, we often look at the regimes in our life to decide whether they need a shake up – and it’s often a good time to examine the practices we have in place at work as well…

Most Maintenance Managers will say that they have a maintenance regime that covers the majority of their assets and keeps them in the best possible condition.  When we talk maintenance however, we don’t ask what a factory’s Planned Preventative Maintenance (PPM) regime covers, we ask how the assets are prioritised, and which are the business critical machines within the plant.

From our experience in the FMCG sector, businesses prioritise maintenance based on the following:

1. New kit – When new machinery is purchased, PPM’s are often created in line with the manufacturers recommendations. Although this can be an effective method it can also be a lengthy process to implement a regime that incorporates the entire factory.  After all, how often do you purchase new items of machinery?

2. Production line or unit – Having purchased new kit recently or not, the majority of businesses will have a proverbial cash cow, the production line that delivers the most amount of profit. The maintenance department will often focus on maintaining these machines at all costs. This focus can frequently change as the business priorities shift, adding pressure on the maintenance department to do the ‘right thing at the right time’

3. Breakdown and Outages – Then there’s the PPMs that are put in place following major breakdowns (AKA the knee jerk method). These are often implemented quickly without a true understanding of the root cause outage and can often result in a number of ineffectual routines that involve a check and inspect type PPM that exhausts valuable maintenance time.

4. Business Pressure – The other approach we see a lot of is to place emphasis on the department that shouts the loudest and longest. But pressure to ensure a regime is in place can result in the wrong focus for the wrong reason and doesn’t necessarily utilise maintenance time for the optimum benefit or true value to the business.

5. Criticality Factors – Thankfully a more sustainable method exists that ensures that right maintenance is carried out at the right time for the right reasons. At Lauras International we advocate prioritising assets with a subjective view, incorporating business needs and maintenance response as criticality influencers. Within these influencers are a number of factors that need to be considered:

  • The business will be concerned with customer service levels. If a process fails with loss of output, will it affect customer service? What quantity of quality defects will be generated should a failure occur and what is the value of these quality defects?
  • Waste and rework can add substantial hidden costs to a product that eats away at the profit margin. Finally, is there a risk to food safety and employee safety? Can your business afford a product recall or lengthy litigation because a member of your team has sustained an injury?
  • The maintenance team will also have their prioritisation process. Mean Time To Repair (MTTR) will be factored into the equation. An asset that takes 8 hours to repair will take priority over an asset that takes less than one hour to repair. Mean Time Between Failure (MTBF) will then come into play. Equipment that has a higher failure rate will require more planned maintenance than others with lower failure rates.
  • Cost to repair major outages will also have a huge bearing on the prioritisation process. Maintenance budgets are stretched at the best of times and consequently unplanned expenditure on maintenance events needs to be avoided.

Scoring all these factors will result in machines receiving a grade ranging from AA (could interrupt manufacturing throughout the factory, typically assigned to 5% of factories’ assets) through to C rated machines that will have little effect on business outputs. The maintenance team is then enabled to create a planned PPM regime focusing initially on the AA ranked business critical assets, through the rest of the grades until all assets have a comprehensive maintenance regime.

Asset prioritisation is the first step; we now know which machines have maintenance priority. So how do we create a value adding PPM routine?  I’ll be sharing my insights in this blog over the coming months…

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s